Works in Progress – March 2012

There are several works in progress at the moment. Some of them are in process every day, some have been sadly neglected.

These quilt blocks are for my niece K. I try to get a pieced quilt, an embroidered quilt, and a crocheted afghan done for each niece or nephew within a year of them being born. Ever since three of them were born within 6 months of each other, I have been behind. This niece MAY receive this quilt in time for her 5th birthday this fall, I hope. I hope she is still fond of bunnies at that age. Next time I am picking a quilt that does not have 12 blocks. My goal is to get this one done in time to enter in the Boulder County Fair this summer.

The next four blocks. June is out of sequence because the transfer on that one didn’t work well and I need to do some tracing. And I see that I neglected to do July’s eyeball, poor rabbit. This pattern was a vintage pattern that came from Patternbee.

Close up of April.

I started these socks in a class on knitting two socks at once on one circular needle. I am not sure that I totally agree this is possible, when it comes to the heels. They are called “Kickline Socks” and I think this would have been a better pattern in a solid color yarn. I am not sure I like these, but they are nearly done. I think the last time I tried them on, they wouldn’t stay up, so I may rip them back part way or all the way and make a pattern I like better, so I could actually wear them, because I really like this yarn color, it is Lorna’s Laces in the colorway Lorakeet.

This sock is going to be the subject of future articles entitled: Can this sock be saved? I  made these ankle socks for my mom a few years ago, and she wore this one out, and then tried to fix it herself. They are toe-up socks, so I think I will be able to just rip it out down to the hole, and start re-knitting. I still have the yarn, so she lucked out there.

This is the “Nancy” one skein shrugigan. A friend at Knit Knight made one and I loved it, so am working on my own. By the Shaefer Yarn Company.

I realize I totally forgot the socks that I am currently working on, whoops. Maybe later this week.

And now for the big project, the color class project. Can you tell what it might be from my design wall? I have no mad drafting skillz, so I just taped out an approximation onto my design wall with masking tape. You can see my youngest niece A’s pieced quilt off to the side, I have ONE strip sewn together.

Here is a rough draft of the design. I decided to do a landscape, but not really a traditional one. And I wanted to draw a design by hand instead of with the computer this time.

It will be something along those lines, at least. We will see how it goes. I have it marked out to be pretty big, so I better get going on it. The colors of the tetrad I chose are blue, orange, yellow-green and red-violet.

7 thoughts on “Works in Progress – March 2012

  1. Pingback: A Busy Weekend | glenderella

  2. Pingback: Quilting, Knitting, Crabs and Owls | glenderella

  3. Heya! I’m at work browsing your blog from my new iphone
    3gs! Just wanted to say I love reading your blog and look forward to
    all your posts! Keep up the excellent work!

Leave a reply to Google Cancel reply